Hello, welcome to Huaxin
Electromagnetic Wire Series

Electromagnetic wire series

Application

 

Province

Customer Name

Shanxi

Yangquan Coal Industry Group: First Mine, Second Mine, Third Mine, Fifth Mine, Xinyuan, Xinjing, Xindadi, Pingshu, Kaiyuan, Hongxia First Construction, Yunyu, Taichang, Sijiazhuang, Changgou, Huozhou Coal Power, Fenxi Zijin Coal Industry, Jiexiu Zhengyi Mine, Changzhi Xiangyuan, Jincheng Dongfeng Coal Mine, Taiyuan Xiyu, Yu County Xingyu Mine, Yu County Dongping Mine, Lu'an Wuyang Mine

Ningxia

Hongliu Mine of Ningxia Coal Group

Shaanxi

Shaanxi Hengyi and Shaanxi Huangling Mine

Gansu

Lanzhou Agan Coal Industry, Gansu Huating, Gansu Yaojie

Shandong

Huaheng Coal Industry of Shandong Energy Group

Anhui

Lan County Changheng of Wanbei Coal Industry, Huainan Mining

Heilongjiang

Shuangyashan Coal Mine Bureau

Henan

Zhengzhou Coal Industry (Group) Co., Ltd.

Electromagnetic wire of the electromagnetic wire

1. Jincheng Dongfeng Coal Mine

 

Field data:

Project

Specific Situation

Using Unit

Shaanxi Hengyi

Installation Site

Boiler Room ZSCB10-800/10

Installation Time

2012.5

Operation Period

49 months

 Specification and Model of the Electromagnetic Wire

 SBEMB  4*5.75

2.First Mine of Yangquan Coal Industry Group

Field Data:

Project

Specific Situation

Using Unit

First Mine of Yangquan Coal Industry Group

Installation Site

No.1 Mine SZ11-16000/35

Installation Time

2013.7

Operation Period

28 months

  Specification and Model of the Electromagnetic Wire

   ZB-0.45 2.12*12.5

   ZB-0.45 3*6.7

   ZB-0.45 2.65*5.6

3. Hongliu Mine of Ningxia Coal Group

Field Operation Data

Project

Specific Situation

Using Unit

Hongliu Mine of Ningxia Coal Group

Installation Site

Main Ventilator ZSG-750-10

Installation Time

2014.7

Operation Period

28 months

  Specification and Model of the Electromagnetic Wire

   ZB-0.3 3.55*7.1   

4. Leasing Branch of Jizhong Energy Fengfeng Group Co., Ltd.

Field Operation Data

Project

Specific Situation

Using Unit

Leasing Branch of Jizhong Energy Fengfeng Group Co., Ltd.

Installation Site

Hydroelectric Power Office ZSG-750-10

Installation Time

2014.7

Operation Period

22 months

  Specification and Model of the Electromagnetic Wire

   ZB-0.3 3.55*7.1   

Contact information

Submit your inquiry
Name:
Your message:
Phone:
E-Mail:
Company:
Name:
Country:
   

Your local Huaxin Sales Team

  • NameKai Wang
  • AddressHuaxin Industrial Park, Yangquan, Shanxi, China 045000
  • PhoneChina:15234310529,Canada:+1 3067132408
  • E-mailkwang@hxindustrial.com
Close
Submit your inquiry
Name:
Your message:
Phone:
E-Mail:
Company:
Name:
Country:
   

Your local Huaxin Service Team

  • NameKai Wang
  • AddressHuaxin Industrial Park, Yangquan, Shanxi, China 045000
  • PhoneChina:15234310529,Canada:+1 3067132408
  • E-mailkwang@hxindustrial.com
Close
Submit your inquiry
Name:
Your message:
Phone:
E-Mail:
Company:
Name:
Country:
   

Your local Huaxin Cooperation Team

  • NameKai Wang
  • AddressHuaxin Industrial Park, Yangquan, Shanxi, China 045000
  • PhoneChina:15234310529, Canada:+1 3067132408
  • E-mailkwang@hxindustrial.com
Close

©1996-2023 晋ICP备07500050号 Huaxin Copyright 

©1996-2023 晋ICP备07500050号 Huaxin Copyright